[1]
Y. Sugara, T. Mursalina, F. Majid, Z. Rismayanti, M. I. T. Taziri, and M. Fauzi, “ANALYSIS OF A01 RAW MATERIAL REQUIREMENT PLANNING USING THE LOT SIZING WAGNER WITHIN, LOT FOR LOT, AND PERIOD ORDER QUANTITY”, CAC, vol. 23, no. 1, pp. 4875–4885, Jun. 2004, Accessed: Jul. 28, 2024. [Online]. Available: https://ca-c.org/CAC/index.php/cac/article/view/487