Analysis of Material Requirement Planning for Pentolite Production (Case Study: Indonesia’s Explosives Manufacturing)
Keywords:
EOQ, LFL, MRP, POQAbstract
A company engaged in manufacturing explosives produces several products, one of which is pentolite. This product is commonly used as primary blasting material for use in mining operations. Fluctuating coal exports affect the demand for pentolite, in addition to the dominant source of imported raw materials, which requires companies to make proper planning for the needs of pentolite raw materials. Material Requirement Planning (MRP) is an inventory planning and scheduling technique used to manage the manufacturing process, this method is appropriate because it can optimize inventory, reduce the risk of delays and increase efficiency. Several lot- sizing techniques will be used in this study to obtain the optimal order size at the lotting stage in MRP. The techniques used are lot for lot (LFL), economic order quantity EOQ), and period order quantity (POQ). The results show that for both P and T raw materials, the lot-sizing technique that gives the smallest inventory cost results is to use the period order quantity.
Downloads
References
Balakrishnan, A. and J. Geunes, Requirements planning with substitutions: exploiting bill-of- materials flexibility in production planning. Manufacturing & Service Operations Management, 2000. 2(2): p. 166-185.DOI: https://doi.org/10.1287/msom.2.2.166.12349.
Mula, J., R. Poler, and J.P. Garcia-Sabater, Material requirement planning with fuzzy constraints and fuzzy coefficients. Fuzzy Sets and Systems, 2007. 158(7): p. 783-793.DOI: ttps://doi.org/10.1016/j.fss.2006.11.003.
Berchet, C. and G. Habchi, The implementation and deployment of an ERP system: An industrial case study. Computers in industry, 2005. 56(6): p. 588-605.DOI: https://doi.org/10.1016/j.compind.2005.02.009.
Asmal, S., et al. Green inventory controlling analysis of coal using the lot sizing technique: Lesson learned form nickel mining industry. IOP Publishing.
Khan, M., M.Y. Jaber, and M. Bonney, An economic order quantity (EOQ) for items with imperfect quality and inspection errors. International Journal of Production Economics, 2011. 133(1): p. 113-118.DOI: https://doi.org/10.1016/j.ijpe.2010.01.023.
Louly, M.-A. and A. Dolgui, Optimal MRP parameters for a single item inventory with random replenishment lead time, POQ policy and service level constraint. International Journal of Production Economics, 2013. 143(1): p. 35-40.DOI: https://doi.org/10.1016/j.ijpe.2011.02.009.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Author
This work is licensed under a Creative Commons Attribution 4.0 International License.
You are free to:
- Share — copy and redistribute the material in any medium or format for any purpose, even commercially.
- Adapt — remix, transform, and build upon the material for any purpose, even commercially.
- The licensor cannot revoke these freedoms as long as you follow the license terms.
Under the following terms:
- Attribution — You must give appropriate credit , provide a link to the license, and indicate if changes were made . You may do so in any reasonable manner, but not in any way that suggests the licensor endorses you or your use.
- No additional restrictions — You may not apply legal terms or technological measures that legally restrict others from doing anything the license permits.
Notices:
You do not have to comply with the license for elements of the material in the public domain or where your use is permitted by an applicable exception or limitation .
No warranties are given. The license may not give you all of the permissions necessary for your intended use. For example, other rights such as publicity, privacy, or moral rights may limit how you use the material.