PROPOSED WORK PROCESS IMPROVEMENT TO MINIMIZE WASTE WITH 8 WASTE APPROACH

Authors

  • Muchammad Fauzi Industrial Engineering Department, Widyatama University Author
  • Arief Rahmana Industrial Engineering Department, Widyatama University Author
  • Annisa Maharani Suyono Industrial Engineering Department, Widyatama University Author
  • Neng Sri Tiana Industrial Engineering Department, Widyatama University Author
  • Muhamad Iqbal Zen Umar Industrial Engineering Department, Widyatama University Author

Keywords:

waste, 8 waste, lean, production

Abstract

The purpose of this study is to analyze activities that do not provide added value and provide suggestions for increased productivity in the IPC division. Research at the PQR company which is engaged in the pharmaceutical business has various wastes in the IPC division. This IPC Division often experiences problems that arise because of waste. For example, the waste that often occurs is the waiting process that often occurs in the production process. The emergence of these problems becomes material for researchers to conduct research using one of the lean manufacturing tools "8 waste". By using Lean Manufacturing, it is hoped that it can solve the problems that occur, Lean Manufacturing is a systematic approach to identify and eliminate waste through a series of improvement activities, the 8 waste method can reduce waste that occurs in the IPC division. The results of identification using the 8 waste method, there are several processes, namely overproduction, waiting for waste, transportation waste, exec processing waste, motion waste, defects, and nonutilized talent waste.

Downloads

Download data is not yet available.

References

Teo, M.M.M. and M. Loosemore, A theory of waste behaviour in the construction industry. Construction management and economics, 2001. 19(7): p. 741-751.DOI: https://doi.org/10.1080/01446190110067037.

Clift, R. and L. Wright, Relationships between environmental impacts and added value along the supply chain. Technological forecasting and social change, 2000. 65(3): p. 281-295.DOI: https://doi.org/10.1016/S0040-1625(99)00055-4.

MacDuffie, J.P. and S. Helper, Creating lean suppliers: diffusing lean production through the supply chain. California management review, 1997. 39(4): p. 118-151.DOI: https://doi.org/10.2307/41165913.

Anvari, A., Y. Ismail, and S.M.H. Hojjati, A study on total quality management and lean manufacturing: through lean thinking approach. World applied sciences journal, 2011. 12(9): p. 1585-1596.

Sumit, K., et al., A quantitative approach for pharmaceutical quality by design patterns. Inveti Rapid: Pharm Anal Qual Assur, 2012. 4: p. 1-8.

Muhsin, A. and P. Susilo, Hospital performance improvement through the hospital information system design. International Journal of Civil Engineering and Technology, 2018. 9(1): p. 918-928.

Jakfar, A., W.E. Setiawan, and I. Masudin, Pengurangan Waste Menggunakan Pendekatan Lean Manufacturing. Jurnal Ilmiah Teknik Industri, 2014. 13(1): p. 43-53.DOI: https://doi.org/10.12928/si.v13i1.1837.

de Bucourt, M., et al., Lean manufacturing and Toyota Production System terminology applied to the procurement of vascular stents in interventional radiology. Insights into imaging, 2011. 2(4):p. 415-423.DOI: https://doi.org/10.1007/s13244-011-0097-0.

Downloads

Published

2022-01-30

How to Cite

Fauzi, M., Rahmana, A., Suyono, A. M., Tiana, N. S., & Umar, M. I. Z. (2022). PROPOSED WORK PROCESS IMPROVEMENT TO MINIMIZE WASTE WITH 8 WASTE APPROACH. CENTRAL ASIA AND THE CAUCASUS, 23(1), 1199-1205. https://ca-c.org/CAC/index.php/cac/article/view/155

Plaudit

Similar Articles

1-10 of 150

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)